Bishkek Completes Half of Planned Road Works; Eight Streets Opened
Bishkek city administration has completed 50% of the planned road construction for this year, totaling 136 roads and sidewalks. Eight streets have been opened after reconstruction, including Krasnodar Street (510 meters), Luchishin Street (600 meters), Ak-Shyrakum Street (600 meters), Semetei Street (1,200 meters), Tokombayev Street (3,200 meters), Mirakhimov Street in the 5th microdistrict (350 meters), Skryabin Street (600 meters), and Osmonkul Street (450 meters). All opened streets have arranged sidewalks and tidied adjacent territories.4 sourcesSee all sources